UIC - International railway union - Page 183

Standards UIC - International railway union - Page 183

UIC – International railway union (in French "Union Internationale des Chemins de fer“, in English "International Union of Railways") is a global company, which coordinates the development and operation of railway transport in all member countries. It also solves the issues of creating new and maintaining current international connections, the unification of railway equipment. It supervises safety criteria such as interlocking plant and automatic brakes. It represents member companies at the international level.

Price display: excl. VAT
Displayed currency: USD
Sort by:

Narrow the selection for the "UIC standards - Page 183" by:    


UIC D117/RP17-1ed.

Stabilisation of ballast by chemical methods

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC D117/RP18-1ed.

The behaviour of track bed structures under repeated loading (First phase Vienna Arsenal tests)

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC D117/RP2-1ed.

Study of the change in the track level as a function of the traffic and of the track components. (First results of laboratory and site tests)

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC D117/RP20-1ed.

The effectiveness of dynamic track stabilisation using the DTS

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC D117/RP21-1ed.

Filtration and drainage Part 2: Filtration rules suitable for materials of track bed structures

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC D117/RP22-1ed.

Influence of frost on the foundation of railways, frost protection by insulation boards

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC D117/RP23-1ed.

Comparative study of the behaviour of different types of substructure layers (temperature, water content and soil pressure measurements): Tests in Ostermunchen station

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC D117/RP24-1ed.

Filtration and drainage: Part 3: Use of geotextiles

Selected format:

Show all technical information.
538.90 USD


in 7 working days
UIC D117/RP25-1ed.

The behaviour of the track bed structure under repeated loading (Tests at ViennaArsenal and Derby)

Selected format:

Show all technical information.
403.50 USD


in 7 working days
UIC D117/RP26-1ed.

Effect on track quality of various subgrade protective layers

Selected format:

Show all technical information.
403.50 USD


in 7 working days

Entries shown from 1820 to 1830 out of a total of 2555 entries.


Can we help you with something?


Cookies Cookies

We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.

You can refuse consent here.

Here you can customize your cookie settings according to your preferences.

We need your consent to use the individual data so that you can see information about your interests, among other things.