UIC - International railway union - Page 200

Standards UIC - International railway union - Page 200

UIC – International railway union (in French "Union Internationale des Chemins de fer“, in English "International Union of Railways") is a global company, which coordinates the development and operation of railway transport in all member countries. It also solves the issues of creating new and maintaining current international connections, the unification of railway equipment. It supervises safety criteria such as interlocking plant and automatic brakes. It represents member companies at the international level.

Price display: excl. VAT
Displayed currency: USD
Sort by:

Narrow the selection for the "UIC standards - Page 200" by:    


UIC D173/RP7-1ed.

Rail steel cleanness assessment and recommended limits

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC D173/RP8-1ed.

Review of the development and use of high strength rail steels

Selected format:

Show all technical information.
538.80 USD


in 7 working days
UIC D173/RP9-1ed.

Definition of Rail Head Profiles and Tolerances

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC D181/DT312-1ed.

Etude de l´influence de la fréquence du filtre sur les valeurs mesurées des forces verticales et latérales sur les rails

Selected format:
French -
Print design (269.40 USD)


Show all technical information.
269.40 USD


in 7 working days
UIC D181/DT313-1ed.

Analyse des déformations latérales d´un pont souple (cas du PONT de LIXHE) Ligne SNCB de TONGRESMONTZEN par J.J. REBER SBB Bau GD

Selected format:
French -
Print design (269.40 USD)


Show all technical information.
269.40 USD


in 7 working days
UIC D181/DT329-1ed.

Parametric study Part 1: Parametric study Initial phase (September 1994) Part 2: Parametric study Phase 2 (February 1995) Authors: L.T. James and G.A. Scott

Selected format:
English -
Print design (808.20 USD)


Show all technical information.
808.20 USD


in 7 working days
UIC D181/RP1-1ed.

Summaries of national standards and literature survey

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC D181/RP2-1ed.

Submitted programs and example of application

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC D181/RP3-1ed.

Dynamic measurements on the steel bridge over the Brenta river on the MilanVenice line at 234 + 0.963 km

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC D181/RP4-1ed.

Dynamic measurements on steel bridges over the Váh river by Sala on the MarcheggSzob line at 117 748 km

Selected format:

Show all technical information.
269.40 USD


in 7 working days

Entries shown from 1990 to 2000 out of a total of 2555 entries.


Can we help you with something?


Cookies Cookies

We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.

You can refuse consent here.

Here you can customize your cookie settings according to your preferences.

We need your consent to use the individual data so that you can see information about your interests, among other things.