We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.
Designation standards: ASME PTC70:2009(R2019)
Publication date standards: 2009
SKU: NS-999342
The number of pages: 28
Approximate weight : 84 g (0.19 lbs)
Country: American technical standard
Category: Technical standards ASME
This code provides the procedures, direction, and guidance for the accurate determination, via testing, of the maximum repeatable load change ramp rate, startup load change rate or shutdown load change rate of a power plant. It is applicable to all electrical generating facilities, independent of fuel source or prime movers. The load change rate is distinguished by starting from one operating point at steady state condition and transitioning to another. Startup commences at a shutdown condition, or intermediary startup condition, and proceeds to a defined running condition. Shutdown begins at a running condition and proceeds to a shutdown condition or intermediary shutdown condition. Measurements of actual net generation as a function of time are the primary test parameters. Additional data and information will be collected as part of this analysis to determine the long and short term effects of various ramp rates on the equipment and systems in the power plant of interest. This information includes and is not limited to design specifications and actual operating conditions.
Reaffirmed: 2019
Do you want to make sure you use only the valid technical standards?
We can offer you a solution which will provide you a monthly overview concerning the updating of standards which you use.
Would you like to know more? Look at this page.
Latest update: 2025-01-10 (Number of items: 2 218 439)
© Copyright 2025 NORMSERVIS s.r.o.