We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.
Standard Practice for Installing Factory-Made Corrugated Steel Pipe for Sewers and Other Applications
Translate name
STANDARD published on 1.6.2022
Designation standards: ASTM A798/A798M-22
Publication date standards: 1.6.2022
SKU: NS-1064782
The number of pages: 7
Approximate weight : 21 g (0.05 lbs)
Country: American technical standard
Category: Technical standards ASTM
This specification covers procedures, soils, and soil placement for the proper installation of corrugated steel pipe and pipe-arches for sewers and other applications. The supporting soil beneath the pipe must provide a reasonably uniform resistance to the imposed load, both longitudinally and laterally. All pipes shall be unloaded and handled with reasonable care. Material used for bedding beneath the pipe shall meet the requirements specified. Pipe shall not be rolled or dragged over gravel or rock and shall be prevented from striking rock or other hard objects during placement on bedding.
Keywords:
corrugated steel pipe, installation, sewers, steel pipe,, ICS Number Code 23.040.10 (Iron and steel pipes)
1. Scope | ||||||||||||||||||||||||||
1.1?This practice covers procedures, soils, and soil placement for the proper installation of corrugated steel pipe and pipe-arches produced to Specification A760/A760M or A762/A762M, in either trench or embankment installations. This practice also covers installation of corrugated steel pipe for alternative uses that do not involve backfilling or soil-structure interaction. 1.2?A typical trench installation and a typical embankment (projection) installation are shown in Figs. 1 and 2, respectively. The pipes described in this practice are manufactured in a factory and furnished to the job in lengths ordinarily from 10 to 30 ft [3 to 9 m], with 20 ft [6 m] being common, for field joining. This practice applies to structures designed in accordance with Practice A796/A796M. FIG. 1?Typical Trench Installation FIG. 2?Typical Embankment (Projection) Installation 1.3?UnitsThis practice is applicable to design in inch-pound units as A798 or in SI units as A798M. Inch-pound units and SI units are not necessarily equivalent. SI units are shown in brackets in the text for clarity, but they are the applicable values when the installation is to be performed in accordance with A798M. 1.4?This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use. 1.5?This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee. |
||||||||||||||||||||||||||
2. Referenced Documents | ||||||||||||||||||||||||||
|
Do you want to make sure you use only the valid technical standards?
We can offer you a solution which will provide you a monthly overview concerning the updating of standards which you use.
Would you like to know more? Look at this page.
Latest update: 2024-12-23 (Number of items: 2 217 157)
© Copyright 2024 NORMSERVIS s.r.o.