Standard Practice for Correction of Unit Weight and Water Content for Soils Containing Oversize Particles
STANDARD published on 31.7.1987
Designation standards: ASTM D4718-87(2001)
Note: WITHDRAWN
Publication date standards: 31.7.1987
SKU: NS-28292
The number of pages: 3
Approximate weight : 9 g (0.02 lbs)
Country: American technical standard
Category: Technical standards ASTM
Keywords:
oversize particles, unit weight, water content, ICS Number Code 93.020 (Earth works. Excavations. Foundation construction. Underground works)
1. Scope | ||||||||||||||||||||
1.1 This practice presents a procedure for calculating the unit weights and water contents of soils containing oversize particles when the data are known for the soil fraction with the oversize particles removed. 1.2 The practice also can be used to calculate the unit weights and water contents of soil fractions when the data are known for the total soil sample containing oversize particles. 1.3 This practice is based on tests performed on soils and soil-rock mixtures in which the portion considered oversize is that fraction of the material retained on the No. 4 sieve. Based on these tests, this practice is applicable to soils and soil-rock mixtures in which up to 40% of the material is retained on the No. 4 sieve. The practice also is considered valid when the oversize fraction is that portion retained on some other sieve, such as the 3/4-in. sieve, but the limiting percentage of oversize particles for which the correction is valid may be lower. However, the practice is considered valid for materials having up to 30% oversize particles when the oversize fraction is that portion retained on the 3/4-in. sieve. 1.4 The factor controlling the maximum permissible percentage of oversize particles is whether interference between the oversize particles affects the unit weight of the finer fraction. For some gradations, this interference may begin to occur at lower percentages of oversize particles, so the limiting percentage must be lower for these materials to avoid inaccuracies in the computed correction. The person or agency using this practice shall determine whether a lower percentage is to be used. 1.5 This practice may be applied to soils with any percentage of oversize particles subject to the limitations given in 1.3 and 1.4. However, the correction may not be of practical significance for soils with only small percentages of oversize particles. The person or agency specifying this practice shall specify a minimum percentage of oversize particles below which the practice need not be applied. If a minimum percentage is not specified, 5% shall be used. 1.6 This practice may not be applicable to soil-rock mixtures which degrade under field compaction. 1.7 This practice offers a set of instructions for performing one or more specific operations. This document cannot replace education or experience and should be used in conjunction with professional judgment. Nat all aspects of this practice may be applicable in all circumstances. This ASTM standard is not intended to represent or replace the standard of care by which the adequacy of a given professional service must be judged, nor should this document be applied without consideration of a project's many unique aspects. The word "Standard" in the title of this document means only that the document has been approved through the ASTM consensus process. |
||||||||||||||||||||
2. Referenced Documents | ||||||||||||||||||||
|
Do you want to be sure about the validity of used regulations?
We offer you a solution so that you could use valid and updated legislative regulations.
Would you like to get more information? Look at this page.
Latest update: 2024-12-22 (Number of items: 2 217 000)
© Copyright 2024 NORMSERVIS s.r.o.