We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.
Standard Test Method for Open-Channel Flow Measurement of Water Indirectly at Culverts
Translate name
STANDARD published on 1.11.2019
Designation standards: ASTM D5243-92(2019)
Publication date standards: 1.11.2019
SKU: NS-980679
The number of pages: 42
Approximate weight : 126 g (0.28 lbs)
Country: American technical standard
Category: Technical standards ASTM
Keywords:
floods, open-channel flow, water discharge,, ICS Number Code 17.120.20 (Flow in open channels)
Significance and Use | ||||||||
5.1 This test method is particularly useful to determine the discharge when it cannot be measured directly with some type of current meter to obtain velocities and sounding equipment to determine the cross section. See Test Method D3858. 5.2 Even under the best of conditions, the personnel available cannot cover all points of interest during a major flood. The engineer or technician cannot always obtain reliable results by direct methods if the stage is rising or falling very rapidly, if flowing ice or debris interferes with depth or velocity measurements, or if the cross section of an alluvial channel is scouring or filling significantly. 5.3 Under flood conditions, access roads may be blocked, cableways and bridges may be washed out, and knowledge of the flood frequently comes too late. Therefore, some type of indirect measurement is necessary. The use of culverts to determine discharges is a commonly used practice. |
||||||||
1. Scope | ||||||||
1.1 This test method covers the computation of discharge (the volume rate of flow) of water in open channels or streams using culverts as metering devices. In general, this test method does not apply to culverts with drop inlets, and applies only to a limited degree to culverts with tapered inlets. Information related to this test method can be found in ISO 748 and ISO 1070. 1.2 This test method produces the discharge for a flood event if high-water marks are used. However, a complete stage-discharge relation may be obtained, either manually or by using a computer program, for a gauge located at the approach section to a culvert. 1.3 The values stated in inch-pound units are to be regarded as standard. The values given in parentheses are mathematical conversions to SI units that are provided for information only and are not considered standard. 1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use. 1.5 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee. |
||||||||
2. Referenced Documents | ||||||||
|
Do you want to make sure you use only the valid technical standards?
We can offer you a solution which will provide you a monthly overview concerning the updating of standards which you use.
Would you like to know more? Look at this page.
Latest update: 2024-12-22 (Number of items: 2 217 000)
© Copyright 2024 NORMSERVIS s.r.o.