We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.
Standard Practice for Management of Low Risk Property (LRP)
Translate name
STANDARD published on 1.11.2017
Designation standards: ASTM E2811-17
Note: WITHDRAWN
Publication date standards: 1.11.2017
SKU: NS-801619
The number of pages: 2
Approximate weight : 6 g (0.01 lbs)
Country: American technical standard
Category: Technical standards ASTM
Keywords:
low risk property (LRP), risk assessment, risk management,, ICS Number Code 03.100.01 (Company organization and management in general)
Significance and Use | ||||||||||||
4.1 LRP should be administratively controlled and managed using less resource-intensive methods than higher risk property. 4.2 The type and scope of control and management should be commensurate with the level of risk. The entity shall determine the level of risk considering the following criteria: 4.2.1 Scarcity, 4.2.2 Technological obsolescence, 4.2.3 Lead time, 4.2.4 Standardization, 4.2.5 Criticality, 4.2.6 Sensitivity, 4.2.7 Threshold/monetary values, 4.2.8 Environmentally regulated, 4.2.9 National security/threat, 4.2.10 Schedule constraints, 4.2.11 Vulnerability, 4.2.12 Societal or personal safety, 4.2.13 Documented business agreements (for example, contract, grant, memorandum of agreement), and 4.2.14 Initial accounting treatment. Note 1: The listing in 4.2.1
– 4.2.14 is not all
inclusive and may be supplemented by the entity and country. The
management threshold/monetary value for item 4.2.7 in the United States and
internationally may fluctuate up to $5000.00 or higher depending on
agency and industry type.
4.3 The information received from conducting standard asset Life Cycle Processes (LCP) within each Life Cycle Stage (LCS) for LRP may not provide sufficient value to the entity that is equal to or greater than the cost associated with performing the processes. 4.4 Entities should establish policies and procedures, based on certain criteria in determining whether all or selected asset LCP should be conducted for LRP. 4.5 The success of any entity is dependent in part on its operational effectiveness. To be effective entities should shift their focus from “risk avoidance” to one of “risk management.” The required processes and associated cost to eliminate all risk is prohibitive and contrary to producing timely, high-quality, and competitive products and services. 4.6 While a variety of different strategies can mitigate or eliminate risk, the process for identifying risk includes: 4.6.1 Vulnerability of the asset, and 4.6.2 Consequence of a loss. 4.7 The process for managing the risk includes: 4.7.1 Reduction of risk, and 4.7.2 Prioritization of the risk management based on importance. |
||||||||||||
1. Scope | ||||||||||||
1.1 This practice covers the assessment of risk and management of low risk property (LRP). 1.2 This practice is directed at tangible LRP. 1.3 This practice does not promote mismanagement or dereliction of duty to protect property, nor protecting property unreasonably – to the extent that usefulness is impaired. This practice recognizes the constraints of materiality and costs versus benefits in the control and management of property. 1.4 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee. |
||||||||||||
2. Referenced Documents | ||||||||||||
|
Do you want to make sure you use only the valid technical standards?
We can offer you a solution which will provide you a monthly overview concerning the updating of standards which you use.
Would you like to know more? Look at this page.
Latest update: 2024-12-26 (Number of items: 2 217 217)
© Copyright 2024 NORMSERVIS s.r.o.