UIC - International railway union - Page 164

Standards UIC - International railway union - Page 164

UIC – International railway union (in French "Union Internationale des Chemins de fer“, in English "International Union of Railways") is a global company, which coordinates the development and operation of railway transport in all member countries. It also solves the issues of creating new and maintaining current international connections, the unification of railway equipment. It supervises safety criteria such as interlocking plant and automatic brakes. It represents member companies at the international level.

Price display: excl. VAT
Displayed currency: USD
Sort by:

Narrow the selection for the "UIC standards - Page 164" by:    


UIC C149/RP11-1ed.

The effect of an airshaft on the pressure transients generated by a single train in a double track tunnel

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC C149/RP12-1ed.

Aerodynamic measurements in the DES BACHEES tunnel

Selected format:

Show all technical information.
269.40 USD


in 7 working days
269.40 USD


in 7 working days
UIC C149/RP2-1ed.

Aerodynamic measurements in the Heitersberg tunnel

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC C149/RP3-1ed.

Aerodynamic measurements taken in a number of tunnels on the new high speed line between Rome and Florence

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC C149/RP4-1ed.

Parametric study of pressure changes in tunnels Part I: Single trains in simple tunnels

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC C149/RP5-1ed.

Measurements of the slipstream produced by a passing train (tests in Monte Perazzo tunnel)

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC C149/RP6-1ed.

Parametric study of pressure changes in tunnels (Part 2: Trains passing in tunnels)

Selected format:

Show all technical information.
403.50 USD


in 7 working days
UIC C149/RP7-1ed.

Aerodynamic measurements taken in RillylaMontagne Tunnel

Selected format:

Show all technical information.
538.90 USD


in 7 working days
UIC C149/RP8-1ed.

Tests to determine the effect of air shafts on the pressure changes in a single track tunnel (Überlingen tunnel)

Selected format:

Show all technical information.
538.90 USD


in 7 working days

Entries shown from 1630 to 1640 out of a total of 2555 entries.


Can we help you with something?


Cookies Cookies

We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.

You can refuse consent here.

Here you can customize your cookie settings according to your preferences.

We need your consent to use the individual data so that you can see information about your interests, among other things.