UIC - International railway union - Page 163

Standards UIC - International railway union - Page 163

UIC – International railway union (in French "Union Internationale des Chemins de fer“, in English "International Union of Railways") is a global company, which coordinates the development and operation of railway transport in all member countries. It also solves the issues of creating new and maintaining current international connections, the unification of railway equipment. It supervises safety criteria such as interlocking plant and automatic brakes. It represents member companies at the international level.

Price display: excl. VAT
Displayed currency: USD
Sort by:

Narrow the selection for the "UIC standards - Page 163" by:    


UIC C138/RP2-1ed.

Limit values for the Y and Q forces from the point of view of rail stresses

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC C138/RP3-1ed.

Derailment tests with twoaxled wagon at Derby

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC C138/RP4-1ed.

Effect of the spacing of consecutive axles on the maximum permissible value of from the point of view of track displac

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC C138/RP5-1ed.

Effect of train speed on the permissible maximum value of load from the point of view of track displacement

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC C138/RP6-1ed.

Persmissible maximum values for the Y and Q forces from the point of view of rail stresses as a function of different parameters

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC C138/RP7-1ed.

Effects pf oscillatory variations of the axleload on the maximum permissi ble value of load from the point of view of

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC C138/RP8-1ed.

Statistical analysis of tests for the (Y/Q) a derailment criterion

Selected format:

Show all technical information.
808.30 USD


in 7 working days
UIC C138/RP9-1ed.

Verification of limit values Tests under operating conditions Comparison of limit values with the actual position (Final report)

Selected format:

Show all technical information.
1 347.20 USD


in 7 working days
UIC C143/RP1-1ed.

Problems encountered by the railway administrations in the field of environmental pollution (report of enquiry)

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC C149/RP1-1ed.

Theoretical prediction methods for calculating unsteady flows in railway tunnels

Selected format:

Show all technical information.
269.40 USD


in 7 working days

Entries shown from 1620 to 1630 out of a total of 2555 entries.


Can we help you with something?


Cookies Cookies

We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.

You can refuse consent here.

Here you can customize your cookie settings according to your preferences.

We need your consent to use the individual data so that you can see information about your interests, among other things.