UIC - International railway union - Page 180

Standards UIC - International railway union - Page 180

UIC – International railway union (in French "Union Internationale des Chemins de fer“, in English "International Union of Railways") is a global company, which coordinates the development and operation of railway transport in all member countries. It also solves the issues of creating new and maintaining current international connections, the unification of railway equipment. It supervises safety criteria such as interlocking plant and automatic brakes. It represents member companies at the international level.

Price display: excl. VAT
Displayed currency: USD
Sort by:

Narrow the selection for the "UIC standards - Page 180" by:    


UIC D101/RP24-1ed.

Thermal phenomena in the interaction between CWR and bridges in the case of a RENFE prestressed concrete bridge with 20 isostatic spans carrying ballasted track (HACHO bridge)

Selected format:

Show all technical information.
403.50 USD


in 7 working days
UIC D101/RP25-1ed.

Thermal phenomena in the interaction between CWR and bridges in the case of a DB prestressed concrete bridge with ballasted track (Kocher Bridge at Kochendorf)

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC D101/RP26-1ed.

Thermal phenomena in the interaction between CWR and bridges in the case of a steel CFF bridge with three spans, an expansion lenght of 56 m, non ballasted track and CWR (bridge across the Emmen near Luterbach)

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC D101/RP27-1ed.

Measurement of the thermal effects in the interaction between continuous welded rails and superstructure in the case of a CFF twospan steel structure with an expansion lenght of 110 m, nonballasted track and long welded rails (bridges across the Aare near

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC D101/RP28-1ed.

Interactions between track and structure due to the influence of temperature in the case of continuous welded rails: synthesis report

Selected format:

Show all technical information.
403.50 USD


in 7 working days
269.40 USD


in 7 working days
UIC D101/RP4-1ed.

Braking and starting tests on three unballasted steel bridges of about 15, 30 and 60 metre span

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC D101/RP5-1ed.

Braking and starting tests on a steel bridge of 30 m span with ballast bed

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC D101/RP6-1ed.

Theoritical studies of braking and acceleration forces on bridges

Selected format:

Show all technical information.
269.40 USD


in 7 working days
UIC D101/RP7-1ed.

Braking tests on straight track with a long train

Selected format:

Show all technical information.
269.40 USD


in 7 working days

Entries shown from 1790 to 1800 out of a total of 2555 entries.


Can we help you with something?


Cookies Cookies

We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.

You can refuse consent here.

Here you can customize your cookie settings according to your preferences.

We need your consent to use the individual data so that you can see information about your interests, among other things.