We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.
Standard Guide for Installing Plastic DWV Piping Suspended from On-Grade Slabs (Includes all amendments And changes 11/30/2017).
Automatically translated name:
Standard Guide for Installing Plastic DWV Piping Suspended from On-Grade Slabs
STANDARD published on 1.2.2011
Designation standards: ASTM F2536-06b(2011)
Note: WITHDRAWN
Publication date standards: 1.2.2011
SKU: NS-54087
The number of pages: 3
Approximate weight : 9 g (0.02 lbs)
Country: American technical standard
Category: Technical standards ASTM
Keywords:
hangers, suspended DWV, underslab, DWV pipe/tube, Plastics, Slabs, ICS Number Code 23.040.01 (Pipeline components in general. Pipelines)
Significance and Use | ||||||
This guide is for use by designers, specifiers, installation contractors, regulatory agencies, owners and inspection organizations who are involved in these piping installations in buildings of this type. |
||||||
1. Scope | ||||||
1.1 This guide provides procedures for the installation of DWV piping in buildings that are built where soil conditions require the use of pier or piling supported grade beam construction or in filled ground where the soil compaction is less than 95 %. These procedures are intended to ensure that the DWV piping suspended from the on grade concrete slabs is not damaged or destroyed by movement of the soil or fill under the slab after the building is completed and occupied. 1.2 In this type of construction, the area within the grade beams is filled with soil up to a level that allows the concrete slab to be poured directly on the fill without a supporting form. In this process the sanitary waste piping is installed by trenching into the fill, and then putting hangers with support rods on the pipes as they are installed. The hanger rods extending upward must be long enough so that the top of the rod will be embedded in and anchored in the concrete. 1.3 The hanger rods are intended to provide adequate strength and corrosion resistance to assure long term service. 1.4 The details of installation are intended to ensure that the rods remain vertical, that they extend into the concrete an adequate amount and that the upper ends are terminated so that they have adequate “pull out” strength. 1.5 The details of backfill are intended to limit or minimize the loads on the a suspended piping. These loads result from consolidation or movement of the soil/fill beneath the slab. 1.6 The values stated in inch-pound units are to be regarded as standard. No other units of measurement are included in this standard. 1.7 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. |
||||||
2. Referenced Documents | ||||||
|
Historical
1.9.2006
Historical
1.7.2013
Historical
1.6.2010
Historical
15.12.2010
Historical
1.3.2010
Historical
1.3.2010
Do you want to make sure you use only the valid technical standards?
We can offer you a solution which will provide you a monthly overview concerning the updating of standards which you use.
Would you like to know more? Look at this page.
Latest update: 2024-12-22 (Number of items: 2 217 000)
© Copyright 2024 NORMSERVIS s.r.o.